Safety Flash

Uncontrolled movement of crane block and pennant during lifting operations at sea

IMCAInternational Marine Contractors AssociationIMCA SF 21/17

Uncontrolled movement of crane block and pennant during lifting operations at sea

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

During bunkering at sea, vessel roll caused a crane hoist block to strike a platform, setting its pennant and hook swinging into a workstation near deck crew. The flash examines rejected arrangements, limited communication and inadequate interdepartmental planning, and records stopping, reassessing and rerouting the hose before completion.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 21/17
Date
23 August 2017
Topic
Line of Fire
Activity
Bunkering, Lifting Operations
Equipment
Crane, Hose, Lifting Accessories
Control
Control of Work, Permit to Work, Safety Communication, Stop-Work Authority
Sector
Marine Industry
Setting
Vessel
Link
Checked , working
Record
imca-sf-21-17-uncontrolled-movement-of-crane-block-and-pennant-during-lifting-operations-at-sea · added 1 September 2026

Report a problem with this record