Safety Flash
Use of damaged electrical equipment by dock workers
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
Third-party welders preparing anchor sea-fastening work aboard a vessel in port had damaged wiring connected without a plug. Vessel crew stopped the job, and the ETO repaired the wiring and fitted a suitable plug. The flash highlights omitted visual inspections and possible lessons for subcontractor oversight during busy port calls and mobilisations.