Investigation Report
Grounding of oil tanker Borga
Read at MAIBOpens the publisher’s page on gov.uk
Summary
Investigation of BORGA’s grounding under pilotage at Milford Haven examines delayed removal of port helm and speed-dependent manoeuvring with a controllable-pitch propeller and Becker rudder. Simulator reconstructions supported the significance of astern pitch. The report also analyses steering coupling failure, bridge monitoring and hydraulic alarm limitations; no oil pollution occurred.