Investigation Report

Synthetic-Base Mud Discharge During Cement-Unit Mixing Equipment Testing

BSEEBureau of Safety and Environmental Enforcement

05-14-2009 15:00 G23000 GC/847 Pollution

Read at BSEEOpens the document on bsee.gov

Summary

Investigation of a Gulf of Mexico release during cement-unit mixing equipment testing. Open measuring-tank valves allowed synthetic-base mud to mix with drill water discharged overboard. Four barrels of mud contained 2.12 barrels of base oil. The report records valve lockout, job safety analysis and sequential-operation requirements introduced by the cement company.

Topics

About This Record
Original title
05-14-2009 15:00 G23000 GC/847 Pollution
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Hydrocarbon Release
Activity
Fluid Transfer
Equipment
Process Pipework and Pipelines, Storage Tanks, Valve
Control
Job Safety Analysis, Lockout and Tagout, Pollution Reporting, Simultaneous Operations Coordination
Sector
Upstream Oil and Gas
Setting
Marine Waters
Link
Checked , working
Record
bsee-44d1da48bd · added 2 October 2026

Report a problem with this record