Investigation Report
UPS Capacitor Failure and Power Loss at Perdido Spar
Read at BSEEOpens the document on bsee.gov
Summary
Investigates a reported fire and power loss at Perdido Spar following UPS capacitor failure. Smoke detection triggered automatic shut-in and personnel mustered; the fire team saw no fire. Electrical troubleshooting identified inverter arcing before lockout and bypass. The report recommends replacing fans and capacitors on similar units.