Safety Alert

MUX Cables and Hotline Hose Damage results in BOP Control Pods Losing Power and Communications

IADCInternational Association of Drilling ContractorsIADC Alert 22-04

MUX Cables and Hotline Hose Damage results in BOP Control Pods Losing Power and Communications

Read at IADCOpens the publisher’s page on iadc.org

Summary

A subsea blowout preventer experienced partial communications loss while latched to a well. Excessive tension during harsh weather and extreme heave damaged the hotline hose and yellow and blue pod multiplexed communication cables. BOP control and operability remained available through the Acoustic Pod and subsea ROV panel.

Topics

About This Record
Publisher
International Association of Drilling Contractors
Type
Safety Alert
Reference
IADC Alert 22-04
Date
14 November 2022
Topic
Mechanical Failure, Well Control
Equipment
Blowout Preventer, Hose
Sector
Upstream Oil and Gas
Setting
Subsea
Link
Checked , working
Record
iadc-alert-22-04 · added 3 September 2026

Report a problem with this record