Safety Flash

Near-miss: Failure of gas quad fitting

IMCAInternational Marine Contractors AssociationIMCA SF 07/13

Near-miss: Failure of gas quad fitting

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A gas-bank equalisation transfer in an ashore yard suffered a cracked, incorrectly specified low-pressure fitting failure. A fragment struck a nearby workshop wall, and inadequate whip checks allowed hose damage. No injuries occurred. Lessons address pressure ratings, thread awareness, training, risk assessment, hose restraint, restricted access and real-time pressure measurement.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 07/13
Date
9 May 2013
Topic
Line of Fire, Mechanical Failure, Pressure Systems
Activity
Fluid Transfer
Equipment
Hose
Control
Competence and Training, Exclusion Zones, Positive Retention and Reliable Securing, Risk Assessment
Setting
Onshore Facility