Safety Flash

Damage to flexible riser

IMCAInternational Marine Contractors AssociationIMCA SF 18/22

Damage to flexible riser

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A water injection riser suffered outer-coating damage against a sharp moonpool flare during installation through a vessel’s tilted lay system. The flash identifies missed design hazards, inadequate risk controls and failure to transfer earlier lessons. Recommendations address lifecycle learning, sharp-edge mitigation and vessel-team review of project-supplied equipment.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 18/22
Date
22 July 2022
Topic
Learning from Incidents, Risk Management, Structural and Asset Integrity
Activity
Marine Operations
Control
Risk Assessment
Sector
Marine Industry
Setting
Vessel
Link
Checked , working
Record
imca-sf-18-22-damage-to-flexible-riser · added 1 September 2026

Report a problem with this record