Safety Flash
Smouldering coiled extension cable
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
An extension lead powering a blower during engine-room manhole ventilation overheated and smouldered. It remained around 80% coiled and was incorrectly specified. The flash describes crew awareness gaps, removal of non-approved leads, and instructions to fully unwind cables, supported by revised vessel procedures and training.