Safety Flash

Connection failure during lifting operation

IMCAInternational Marine Contractors AssociationIMCA SF 26/22

Connection failure during lifting operation

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A tugger-line splice opened while a Vibro Lifting Tool was being positioned on a windfarm installation vessel. No injuries occurred, and an exclusion zone kept personnel clear. The flash discusses possible contributing factors, including unengineered connections and splice quality, alongside actions addressing competence, inspection, maintenance and suitable shackles.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 26/22
Date
23 November 2022
Topic
Line of Fire, Mechanical Failure
Activity
Lifting Operations, Rigging
Equipment
Lifting Accessories
Control
Competence and Training, Exclusion Zones, Operating and Work Procedures, Preventive Maintenance
Sector
Offshore Wind
Setting
Vessel
Link
Checked , working
Record
imca-sf-26-22-connection-failure-during-lifting-operation · added 1 September 2026

Report a problem with this record