Safety Flash
Main ROV lift wire umbilical and bullet parted
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
An inspection-class ROV and its tether management system fell to the seabed during recovery after the main lift connection parted. The flash examines a recently re-terminated, load-tested bullet connection, failed potting compound and high ambient temperatures, and records procedural changes addressing temperature limits, compound quantities and storage details.