Investigation Report

Flooding of forward machinery space of ro-ro passenger ferry P&OSL Canterbury

MAIBMarine Accident Investigation Branch

Flooding of forward machinery space of ro-ro passenger ferry P&OSL Canterbury

Read at MAIBOpens the publisher’s page on gov.uk

Summary

MAIB investigates flooding aboard P&OSL Canterbury during arrival at Dover. An open test valve and an overboard discharge valve without non-return capability permitted seawater backflooding during bilge pumping preparations. The synopsis describes recovery measures, subsequent valve and instruction changes, and recommendations concerning pump starters and test-line arrangements.

Topics

About This Record
Publisher
Marine Accident Investigation Branch
Type
Investigation Report
Date
Unknown
Topic
Vessel Flooding and Foundering
Activity
Marine Operations
Equipment
Pumps, Valve
Control
Emergency Response, Flood Containment and Watertight Integrity, Operating and Work Procedures
Sector
Marine Industry
Setting
Port and Quayside, Vessel
Link
Checked , working
Record
maib-flooding-of-forward-machinery-space-of-ro-ro-passenger-ferry-p-osl-canterbury-while · added 3 September 2026

Report a problem with this record