Investigation Report
Subsea Flowline Gas Release During Replacement Control Module Testing
Read at BSEEOpens the document on bsee.gov
Summary
Investigation of a subsea flowline gas release during testing of a replacement control module at Viosca Knoll 989 A. An ROV located bubbles at a bend; testing stopped and the pipeline was isolated. Talos suspected a previous field repair and possible corrosion, but the exact cause remained undetermined pending inspection and testing.