Investigation Report

LACT Charge-Pump Fire on Offshore Platform

BSEEBureau of Safety and Environmental Enforcement

11-26-2025 1239 G01317 MP 300-B Fire

Read at BSEEOpens the document on bsee.gov

Summary

BSEE investigates a LACT charge-pump fire on Cantium’s Main Pass 300 B platform. Evidence suggests motor-to-pump misalignment following motor replacement caused progressive mechanical failure and hydrocarbon ignition. The report examines installation practices, missing torque and alignment records, alarm history, firefighting and isolation, and subsequent alignment verification measures.

Topics

About This Record
Original title
11-26-2025 1239 G01317 MP 300-B Fire
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Fire, Hydrocarbon Release, Mechanical Failure
Activity
Electrical Work, Inspection and Maintenance
Equipment
Pumps, Rotating Machinery
Control
Alarm Management, Fire Protection, Operating and Work Procedures
Sector
Upstream Oil and Gas
Setting
Offshore Installation