Investigation Report

Gas Release Following Braided Steel Hose Rupture

BSEEBureau of Safety and Environmental Enforcement

06-26-2010 00:15 G03818 MC/280 Required Muster - Shutdown from Gas Release

Read at BSEEOpens the document on bsee.gov

Summary

Investigation of a gas release on the MC 280 A platform following an apparent pressure safety valve malfunction and braided steel hose rupture. Venting persisted after shutdown and isolation. Personnel mustered, and subsequent closure of the well production casing valve stopped the release. No injuries were reported.

Topics

About This Record
Original title
06-26-2010 00:15 G03818 MC/280 Required Muster - Shutdown from Gas Release
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Hydrocarbon Release, Mechanical Failure, Pressure Systems
Equipment
Hose, Valve
Control
Emergency Response, Energy and Process Isolation, Pressure Relief
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
bsee-bb49745cc6 · added 2 October 2026

Report a problem with this record