Investigation Report
Platform Electrical Fire Following High Well Pump Amperage
Read at BSEEOpens the document on bsee.gov
Summary
Investigation of an electrical fire on Platform Henry following high amperage in a well pump. Circuit breakers failed to trip, and fire detection did not initiate an alarm or automatic shutdown. Personnel manually shut down the platform and extinguished the fire. Recommendations address breaker replacement and verification of detection coverage.