Safety Alert

BSEE Safety Alert 514 - Verify Megger Testing and Termination Prep to Prevent Seawater Pump Motor Fires

BSEEBureau of Safety and Environmental EnforcementSafety Alert 514

BSEE Safety Alert 514 - Verify Megger Testing and Termination Prep to Prevent Seawater Pump Motor Fires

Read at BSEEOpens the document on bsee.gov

Summary

A seawater pump motor fire followed termination repairs. Findings identified insulation testing at a lower voltage than required, resistance below the work-pack threshold and inadequate semiconductor-layer preparation. BSEE recommends considering adherence to repair instructions, verification of test arrangements and results, correctly rated testers and worker understanding of resistance units.

Topics

About This Record
Publisher
Bureau of Safety and Environmental Enforcement
Type
Safety Alert
Reference
Safety Alert 514
Date
6 February 2026 (added from another catalogue record)
Topic
Electrical Safety, Fire
Activity
Electrical Work, Inspection and Maintenance
Equipment
Pumps
Control
Competence and Training, Operating and Work Procedures, Pre-Use Checks
Sector
Upstream Oil and Gas
Link
Checked , working
Record
bsee-safety-alert-514 · added 1 September 2026

Report a problem with this record