Safety Flash
Crane wire parted during offshore operations
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
A vessel crane wire failed while overboarding a concrete mattress for a pipeline crossing, dropping the load before it entered the water. The flash examines unresolved magnetic rope testing results, misunderstood operational limits and absent change management, and calls for better shore–vessel communication and lift routing away from existing pipelines.