Potential engine room flooding: maintenance and equipment failure issues on a laid-up vessel

IMCAInternational Marine Contractors AssociationIMCA SF 31/17

Potential engine room flooding: maintenance and equipment failure issues on a laid-up vessel

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A cooling-line hose disconnected after a corroded clamp broke during maintenance aboard a vessel in cold lay-up. Seized isolation valves complicated stopping the seawater flow. The flash examines maintenance records, crew communications and emergency preparedness, recommending more rigorous inspection and better management of maintenance and safety systems for laid-up vessels.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 31/17
Date
15 December 2017
Topic
Corrosion, Mechanical Failure, Vessel Flooding and Foundering
Activity
Inspection and Maintenance
Equipment
Hose, Valve
Control
Emergency Response, Energy and Process Isolation, Preventive Maintenance, Safety Communication
Sector
Marine Industry
Setting
Vessel
Link
Checked , working
Record
imca-sf-31-17-potential-engine-room-flooding-maintenance-and-equipment-failure-issues-on-a-laid-up · added 1 September 2026

Report a problem with this record