Investigation Report

Grounding of ro-ro freight ferry Arrow

MAIBMarine Accident Investigation Branch

Grounding of ro-ro freight ferry Arrow

Read at MAIBOpens the publisher’s page on gov.uk

Summary

Investigation of Arrow’s grounding in Aberdeen Harbour during thick fog examines bridge-team workload, restricted-visibility preparations and radar navigation. It analyses electronic chart system limitations, console ergonomics, passage planning and harbour arrangements. Simulator trials demonstrated benefits from separating steering and navigation. The ferry was refloated without injuries or pollution.

Topics

About This Record
Publisher
Marine Accident Investigation Branch
Type
Investigation Report
Date
1 July 2021
Topic
Human Factors, Vessel Grounding
Activity
Navigation
Equipment
Navigation and Positioning Equipment, Operator Displays and Control Interfaces
Control
Competence and Training, Operating and Work Procedures, Risk Assessment, Safety Communication
Sector
Marine Industry
Setting
Port and Quayside, Vessel
Link
Checked , working
Record
maib-grounding-of-ro-ro-freight-ferry-arrow · added 2 September 2026

Report a problem with this record