Investigation Report
Emergency Buoy Disconnect Failed Following Loss of Station
Read at BSEEOpens the document on bsee.gov
Summary
BSEE investigates a failed emergency buoy disconnect on Helix Producer 1 following weather-related loss of station. Subsea production shut in successfully, but a hydraulic piston failed to open. The report details disconnect-system testing, piston replacement and subsequent maintenance measures; teardown inspection found no cylinder failure, and no injuries or infrastructure damage were reported.