Investigation Report
Synthetic-Base Mud Discharge During Circulation Before Storm Packer Setting
Read at BSEEOpens the document on bsee.gov
Summary
An investigation records a 62-barrel synthetic-base mud discharge during circulation before setting a storm packer. An inadvertently closed flowline caused overflow, while a previously opened shunt valve provided an overboard route. Reported changes included restricted valve authorisation, permit sign-off, a blind flange and rerouting the pollution-pan drain to skimmer tanks.