An investigation records a 62-barrel synthetic-base mud discharge during circulation before setting a storm packer. An inadvertently closed flowline caused overflow, while a previously opened shunt valve provided an overboard route. Reported changes included restricted valve authorisation, permit sign-off, a blind flange and rerouting the pollution-pan drain to skimmer tanks.

Topics

About This Record
Original title
08-15-2007 12:30 G15607 GC/743 Pollution - Incident >$25K
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Loss of Containment
Activity
Drilling
Equipment
Process Pipework and Pipelines, Valve
Control
Energy and Process Isolation, Permit to Work, Pollution Reporting
Sector
Upstream Oil and Gas