Investigation Report
Buoyant Riser Assembly Rose and Damaged Supports During Well Abandonment
Read at BSEEOpens the document on bsee.gov
Summary
Investigation of a riser-cutting incident during well abandonment at Hoover Spar. Positive buoyancy drove the stem/can assembly upwards, breaking deck stopper bolts and damaging support beams and nitrogen lines. Bolt analysis identified corrosion and section loss. Revised procedures removed buoyancy and landed the assembly before cutting; no injuries or pollution occurred.