Incorrect as-built drawing configuration
Incorrect as-built drawing configuration
- IMCA
- Safety Flash
- IMCA SF 03/22
- DivingIsolationStructural and Asset Integrity
- Barrier management
- Diving operationsInspection and maintenance
- Energy and process isolationStop-work authority
- Subsea
Summary
Divers investigating leaks at a subsea manifold followed approved procedures based on incorrect client information. Fault-finding revealed a different jumper configuration, leaving only one unproven barrier during intervention. Work stopped pending confirmation of safety; the client investigated without identifying how the error arose, and amended drawings were formally approved.
Classifications: Barrier management; safety barrier management.
Classifications: Diving operations; diving; commercial diving.
Classifications: Inspection and maintenance; asset inspection; equipment maintenance.
Classifications: Energy and process isolation; isolation; energy isolation.
Classifications: Stop-work authority; stop work; stop-work intervention.
Classifications: Subsea; underwater worksite.
Summary
A subsea asset’s actual jumper configuration differed from the data received from the client.
IMCA SF 03/22. Themes: diving, isolation, structural and asset integrity.