Safety Flash

Loss of redundancy in diving bell launch and recovery PLC system

IMCAInternational Marine Contractors AssociationIMCA SF 13/23

Loss of redundancy in diving bell launch and recovery PLC system

Read at IMCAOpens the publisher’s page on imca-int.com

Summary

A diving bell launch and recovery system lost automatic PLC redundancy when a synchronisation module developed a faulty transmitting diode. Unavailable spares delayed repair. Following risk assessment and successful testing of independent processors and manual changeover, the vessel resumed work using temporary manual redundancy. Automatic redundancy was subsequently restored in port.

Topics

About This Record
Publisher
International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 13/23
Date
24 May 2023
Topic
Functional Safety
Activity
Diving Operations, Inspection and Maintenance
Control
Functional Testing, Risk Assessment
Sector
Marine Industry
Setting
Vessel
Link
Checked , working
Record
imca-sf-13-23-loss-of-redundancy-in-diving-bell-launch-and-recovery-lars-plc-system · added 1 September 2026

Report a problem with this record